The Unit Calculator

How many porta potties do I need?

For work crews, the floor is OSHA's sanitation table · and our own standard runs stricter: one unit per crew of about 10 through a 40-hour week. For events, the industry sizing table works off guests and hours. Run yours below · then we firm it up on the call.

Get a quote.

Tell us the job · our office calls you back with one figure: units, delivery, service, and pickup.

Service type (pick all that apply)

Or call the nearest yard · Lemoore · Modesto · Bakersfield

Trailer-mounted Rent-A-Toilet units with hand-wash stations, staged at golden hour Trailer-mounted units, staged

No Mystery Math

Where these numbers come from.

Two published tables and one standard of our own · each named, so you can check us. If you would rather read the reasoning in plain sentences than run the tool, we walked through it in how many porta potties you need per person.

The jobsite floor: OSHA's sanitation table

OSHA 29 CFR 1926.51(c)(1), Table D-1 sets the legal minimum for construction sites: crews of 20 or fewer need at least one facility; over 20, one toilet seat and one urinal per 40 workers; over 200, one per 50. Temporary field conditions still require at least one toilet on site. (osha.gov, read July 31, 2026.)

Our working standard runs stricter than the floor

OSHA is a legal minimum, not a comfort spec. Our own standard: one unit carries a crew of about 10 through a 40-hour week, serviced weekly. When the two disagree, we quote the stricter number · a compliant site and a usable site aren't always the same thing.

The event table: guests × hours

Event sizing comes from the Portable Sanitation Association International's Standards for Special Events: one unit is good for roughly 200 uses, and a guest goes about once every four hours. Heat over 80°F or alcohol adds 20–30 percent · we take the conservative end. Hand-wash stations pair at one per ten units, and public events usually need at least one ADA unit in the bank. (psai.org, read July 31, 2026. One misprinted cell in the published table · 10,000 guests at 6 hours · is corrected here to keep the numbers consistent.)

When a trailer beats a row of units

Past a certain crowd a restroom trailer covers it in one footprint instead of a row of units · flushing toilets, sinks, and A/C. Which plan fits depends on your headcount and hours, and we set that with you on the call. The plans are laid out side by side on the fleet page.

The calculator gets you close. The call gets you exact.

Terrain, crowd shape, service passes, and placement move the real count · tell us the job and we'll spec it with you.